TBC’s role included insuring that all requirements for LEED™ Commercial Interiors, Energy and Atmosphere prerequisite EAp1 Fundamental Building Systems Commissioning and Energy and Atmosphere Credit EAp3 Additional Commissioning were met.
TBC commissioned the following systems:
•Air handling units
• VAV terminals
• Pumps
• Chiller and Cooling Tower
• Domestic Water Heater
• Unit Heaters
• Exhaust fans (hoods and snorkels)
• Emergency generator monitoring panel
• Web interface
• Building Management Control System (BMCS)