TBC commissioned the following systems:
Mechanical
• Mechanical HVAC Systems
• Heating
• Cooling
• Steam
• Ventilation
• Fuel Oil System
• Building Automation Controls System
Plumbing
• Domestic Hot Water Heating and/or Recirculation Systems
• Medical Gas Systems
• Oxygen
• Nitrogen
• Nitrous Oxide
• Carbon Dioxide
• Medical Air
• Medical Vacuum
• Anesthesia Waste Gas
• Compressed Air
• Decontamination Waste, Emergency Showers
Technology and Life-safety Systems
• Life Safety
• Fire Alarm System
• Fire Sprinkler System
• Technology
• Security/CCTV
• Paging
• Nurse Call
• Clock
• Television