The $8 million Scowcroft IRS Center project was the combination of a renovation of an existing warehouse into a 120,000 sq. ft. office building—coupled with a new cafe restaurant building...
The Carolyn Tanner Irish Humanities Building is an approximately 50,000 sq. ft., $16.5 million, four-floor facility envisioned to anchor the University of Utah’s planned academic quad at the center of campus.
The $20 million, 100,000 sq. ft. Warnock Engineering Building at the University of Utah houses computing and biomedical engineering—emerging areas of study within the engineering field...
Braithwaite comprises three floors and approximately 18,500 total square feet and includes a fine arts gallery which showcases SUU students' and international artists' artwork...
Total Building Commissioning (TBC) provided building commissioning services for a $7.2 milllion, 17,000-sq. ft. addition to the existing 118,000 sq. ft. ABC Warehouse...
Total Building Commissioning (TBC) provided commissioning services for the $9 million Granite Education Center which includes two buildings (totaling 303,700 sq. ft.) that were remodeled...
Total Building Commissioning (TBC) provided commissioning services for this major addition and remodel at American Fork Junior High School in American Fork, Utah...
Total Building Commissioning (TBC) has been retained as the commissioning authority of this 349,000 sq. ft. medical complex comprising the three-story, 79,000 sq. ft. Primary Children’s Medical Center Building...
With art galleries, performance spaces, a black box theatre and three theatres (three sound systems and three lighting systems), the $13.1 million, 78,000 sq. ft. Fine Arts Center...