An evaluation of the Braithwaite building concluded that it required seismic renovation along with renovation and/or replacement of controls, mechanical, electrical, plumbing, lighting and other systems. Total Building Commissioning (TBC) was the commissioning authority on the Braithwaite renovation.
TBC commissioned the following systems:
• HVAC
• Building Management and Control Systems (BMCS)